Ottery Gazebo Construction 2017

Start slideshow
Testing different locations
1 Testing different locations
Testing different locations
2 Testing different locations
Testing different locations - about here should work
3 Testing different locations - about here should work
Testing different locations - about here should work
4 Testing different locations - about here should work
Testing different locations - maybe TOO close to the water
5 Testing different locations - maybe TOO close to the water
Testing different locations - maybe TOO close to the water
6 Testing different locations - maybe TOO close to the water
The jig to mark the footings locations
7 The jig to mark the footings locations
Marking where to dig the footings
8 Marking where to dig the footings
The footings are dug
9 The footings are dug
The footings jig brough back to position the footings attachments
10 The footings jig brough back to position the footings attachments
11 Footings done - concrete poured and setting
12 Footings done - concrete poured and setting
13 The back three posts bolded to the footings
14 All posts bolted to the footings
15 The floor support sill installed
16 The floor support sill installed
17 The floor support sill installed
18 Floor boards being installed
19
20 The steps installed
21 Floor boards complete
22 Floor boards complete
23 A mass of bracing to hold the verticals in place
24 The header sill installed
25 The first roof frame installed
26 The roof under construction
27 The roof under construction
28 The roof under construction
29
30 The roof under construction
31 The roof under construction - the ply sheathing being installed
32 The roof under construction - the ply sheathing being installed
33 The roof under construction - the ply sheathing being installed
34 The roof full sheathed
35 The roof full sheathed
36 The roof full sheathed - tar paper going up
37 The roof full sheathed - tar paper and drip strip up
38 Being shingled
39 Being shingled
40 Being shingled
41 Being shingled
42 Being shingled
43 Being shingled
44 Being shingled
45 Being shingled
46 Being shingled
47 Roof complete! Thank goodness
48 Roof complete!
49 Starting to fill in - the front rails installed
50 Walls framed, window sills in
51 First panel being filled
52 First panel being filled
53 First panel being filled
54 Other panels being installed
55 Other panels being installed
56 All main panels complete
57 All main panels complete
58 Door and railings installed
59 Door and railings installed
60 Bench/ storage box built
61 Bench/ storage box built
62 Glass in - now usabale
63 Ready for (in-)action!
64 Glass in - now usable
65 Open for business
66 Now with storage shelf underneath